Thursday, October 15, 2015

Summer Projects

Along with two rooms worth of new windows, the master bath took the remainder of my savings from working in Alaska last summer. The contractor for the bathroom, a friend from running, discovered terrazzo under the old tiles so I decided to have the floor restore rather than re-tiled. While the terrazzo guy was here, I decided to have him restore the foyer as well. Bye-bye budget.

Floor and windows and the entire house looks fantastic. Gus and I will add a window seat under the bay window and do a minor roof repair. Other than those two things, the summer rehab projects are done.

No comments:

Post a Comment

Post a Comment

Comments